NOATUM TERMINAL SAGUNTO

Multipurpose Terminal granel2 car

Noatum Terminal Sagunto was established in 1990 and operates the largest multi-purpose terminal at the Port of Sagunto.

INFRASTRUCTURE
256,812 sqm

(100,000 sqm for vehicles)
TOTAL AREA

1,230 m

BERTHING LINE

10 m

DEPHT ALONGSIDE

1

RO-RO RAMP

42,125 sqm

STORAGE AREA

null
EQUIPMENT
6

MOBILE CRANES

42

DIESEL FORKLIFTS

6

ELECTRIC CRANE

2

HOPPER

6

REACHSTACKERS

2

WEIGHBRIDGE

MORE INFORMATION

1 Tractor Unit

  • Possibility to increase the storage 50,000 sqm more
  • Machinery available up to 45 Tn (H&H)
  • PDI , Washing and Maintenance services
  • Bonded Temporary warehouse ADT
  • ISPS 22 code
  • Safety procedures and safeguards implemented on the premises:
    • Surveillance of the Enclosed Terminal with 24/7/365 security personnel surveillance
    • Facilities with patrol vehicles
    • Security checkpoint at the visitor entrance
    • CCTV with complete coverage of the operating area
CERTIFICATIONS

NOATUM TERMINAL SAGUNTO has the following certifications in force:

null